YTread Logo
YTread Logo

REBUILDING A WRECKED FERRARI 488 FROM COPART PART 2

Feb 27, 2020
here we have all the

part

s for the blue spider 488, this whole box came from Germany, so what I did was drill the rail and everything that is welded in the front and now the new rail will go there welded to the back and I will place the rivets and original points and that's the original rail, so I'll do the exact same thing on the other side. Okay, we're getting ready to start welding the rails on this 488 with all the measurements. Everything looks fine. The founder fits in perfectly. All spaces. perfect as you can see this guy is perfect aligned same with this side all the spaces are aligned and ready to go here is the welding machine that we have we are painting the front and then we will fuse both doors to make the color matches perfectly well as if nothing I would have passed the new headlights in the box here is the other one as if you stopped I put a Chanel on you perfect positions for your smile I swear on you you are running away from the model I think I'm going crazy it's crazy everything we start is 2 :00 a.m. m. outside when I'm with you otherwise too and you've got me crazy, turn on all my keys, my baby, in my comments to decide.
rebuilding a wrecked ferrari 488 from copart part 2

If you have any copyright issue, please Contact